Track was moulded in the white metal zamak. Whilst these were essentially a made as a toy, all the track and signals came with two pin holes for fixing permanently to a surface for a permanent layout. It was painted grey.
Signalling included semaphore signals, 2-aspect lights, signal boxes and telegraph poles.